The Operability Study (OS) This is a key step in obtaining the necessary technical approval before testing and connecting the electrical installations to the Sistema Eléctrico Interconectado Nacional (SEIN)At OP Energy, we developed this study considering the requirements and scope established by the COES, with the objective of demonstrating that the project is technically prepared to begin its testing, connection and subsequent operation process.
Unlike the Pre-Operational Study, which assesses the expected impact of an installation before its connection, the Operational Study focuses on validating the technical conditions prior to the actual operation of the project. This includes specialized studies requested by COES, as well as the crucial stage of coordinating protection systems with those already implemented in the area of influence of the Connection Point. Therefore, it requires rigor, precise documentation, and an analysis aimed at demonstrating that the installation can be integrated into the system safely, reliably, and in accordance with applicable procedures.
At OP Energy, we understand that this stage is particularly critical, as it represents the step prior to the project's effective integration into the electrical grid. Our team supports the client by preparing the study, reviewing technical conditions, analyzing relevant parameters, and gathering the necessary information to demonstrate technical compliance to the system operator. OP Energy's experience in electrical studies, network analysis, connection engineering, protection coordination, and industry procedures allows us to approach the electrical engineering phase with a comprehensive perspective, anticipating potential issues and strengthening the quality of the technical documentation. Our approach aims to ensure that the client progresses toward the connection and operation of their project with greater certainty, less uncertainty, and expert support during this critical phase of development.
Why choose OP Energy for this service?
Technical preparation for connection: We prepare the necessary study to demonstrate that the facilities are ready for testing and subsequent connection to the National Interconnected System (SEIN), in accordance with applicable requirements. We have our own qualified personnel, sufficient to handle the most specialized studies that COES may request as a requirement for the new facility's connection.
Rigor at a critical stage: We review technical conditions, operating parameters, and project documentation to reduce risks before it becomes operational.
Experience in meeting the demands of the sector: We contribute knowledge of COES procedures, electrical analysis, and connection engineering to strengthen the project's technical compliance.